Low Power Oil Immersed Transformers

Farady offers a wide range of low power oil immersed transformer such as generator duty, unit auxiliary transformers and multi winding transformers. All these step up transformers are customized for industrial plants and distribution substations. Our transformers are extremely versatile with robust construction and highest quality standards.

2017年7月25日星期二

Oil immersed transformers - for very high power (MVA) and voltage

For very high power (MVA) and voltage, we provide oil immersed transformer. This solution guarantees the best possible resistance to dielectric stresses and, by using special heat exchangers, the elimination of losses, which allows the machine to cool. This type of oil type transformer is particularly suitable for energy distribution networks or installations subject to severe weather or environmental conditions. In view of the specificity of the applications, each product is customized to determine the characteristics that can beat satisfy the customer’s needs.

2017年7月20日星期四

oil immersed distribution transformer for delivering excellent performance

oil immersed distribution transformer are known for delivering excellent performance. The expert R&D team develops one of the most advanced designs to withstand short-circuit and impulse voltage tests.
• Able to withstand Short Circuit & Impulse Voltage tests as per IS/IEC
• Powder Coating for excellent finish
• Available as CSP (Completely Self Protected) Type
• Designed to meet customized specifications
• Available as Corrugated Hermetically Sealed Type which is compact in size
• Various ratings type tested from NABL accredited labs

2017年7月15日星期六

oil immersed transformer with better-quality technologies

The expert team in our firm allows us to manufacture and supply leading products of oil immersed transformer.We are backed up with better-quality technologies and advanced machineries to manufacture these products. The remarkable features of these products are strong short-circuit withstand ability, low partial discharge, good aesthetics. This oil type transformer is efficiently used in all substations and also at wind mills in ample range.

2017年7月10日星期一

A winding temperature control function has immersed distribution transformers

A winding temperature control function has oil immersed distribution transformer, which is external casing, housing in the lumen of the transformer windings, characterized in that: the housing The top surface of the fixed outlet box has a wiring board, with a temperature sensor of the pole mounted transformer windings; wiring board terminal box comprises a case, the sealing plate Seal connected to the case top opening, opened outlet hole on the side panel case, open wire alignment hole on the bottom plate cassette; temperature sensor control line longitude positioning holes , outlet hole is connected to an external computer.

2017年7月5日星期三

Farady oil immersed transformer Hanging Point Step

Before the oil immersed transformer hanging core work preparation:
⑴ tool material preparation: such as storage tank, oil filter, complete sets of wrenches, Dao Ben, oil-resistant rubber rope, white cloth, insulation cardboard.
⑵ equipment for the preparation of lifting: such as cranes, chain, lever hoist, tripod, wire rope, etc., if the chain, must be based on the height of the farady transformer and the weight of the hanger.
⑶ transformer oil treatment, take oil samples and test, do a good job in oil preparation, including oil filter paper.
⑷ do the preparation of oil pan, hand-core line.
The height of the hanger (h) shall not obstruct the lifting of the body.
So h = h1 + h2 + h3 + h4 + h5 test = h1 tank height h2 height of the device h3 rope height h4 pulley (or chain) minimum distance h5 standby height (300 ~ 500mm)
1. hanging beam
Pulley
3. Rope sets
4. body
5. Fuel tank
Dropping steps:
⑴ selected hanging core position, put the oil (placed under the broader market)
⑵ remove the explosion-proof tube, oil pillow, gas relay
⑶ remove the big cover bolts
⑷ use the balance iron will be hanging on the iron plate
⑸ check:
① core insulation
② core insulation
③ wear the core bolt insulation
④ tap switch contact insulation
⑤ high and low voltage lead
⑥ tank debris
⑦ heat pipe with or without clogging
⑧ telemetry insulation resistance
⑨ measure the DC resistance
⑹ all items after the inspection did not find the problem should be promptly loaded back, the iron back in the tank
⑺ strong cover bolts
⑻ install the removed accessories
⑼ into the qualified oil
⑽ static 6-10 hours after a full set of pressure test ⑾ site installation.