2015年11月27日星期五

Reliable rural electrification system

Reliable rural electrification system will aim at creating the following:
Rural Electrification Distribution Backbone  with at least one 33/11 kv (or 66/11 kv) compact substation in every Block and more if required as per load, networked and connected appropriately to the state transmission system.china electrical transformer Emanat from REDB would be supply feeders and one distribution transformer at least in every village settlement.Household Electrification from distribution transformer to connect every household on demand.

没有评论:

发表评论